Past Projects from my Fabrication Experience
Below are images of projects that I have worked on and managed during my career as a lead fitter and welder.
This is a rocket transporter built for Space X in southern California. I was not a lead on this project, but did have a hand in the fabrication.
I was the lead fitter on this job (one of my first major projects). All the steel was fabricated in Kent Washington then sent to Anchorage for construction. This structure was a lattice of 6 inch pipe and square tubing and very difficult to build.
This is the new and current clock tower at the entrance to Seatac International Airport. This is a steel structure completely clad with stainless steel plates.
This is a rocket transporter built for Space X in southern California. I was not a lead on this project, but did have a hand in the fabrication.
Many of the projects that I have worked on are shown here. I was required to set up and manage these jobs from start to finish within a specific time limit and man power. Most often I was able to finish my projects under budget and with time to spare.